3430 Willard Street, Fort Myers, Florida 33916

Do You Need a Permit for Your Remodel in Lee County?

by Matthew Plate, Co-Owner / License Holder

Permits are the least exciting part of any remodel, and the part most likely to cause real trouble when they're skipped. We pull permits across Lee County every month, so here is the practical version of how it works: what needs a permit, who issues it, and what happens when work gets done without one.

The general rule

In Florida, work that is structural, electrical, plumbing, or mechanical needs a permit. That covers more than most homeowners expect:

  • Removing or altering any wall, load-bearing or not
  • Additions, enclosures, and lanai conversions
  • Replacing windows, exterior doors, or garage doors
  • Reroofing
  • Moving or adding plumbing fixtures, circuits, or panels
  • Replacing a water heater or air conditioning system
  • Docks, seawalls, pools, and most detached structures

Work that is purely cosmetic generally does not need a permit: paint, most flooring, trim, and countertop swaps. Replacing cabinets usually stays permit-free too, as long as plumbing and electrical stay where they are. The word "generally" matters, because each jurisdiction draws its own lines, which brings us to the next point.

Who issues your permit depends on where you live

Lee County is a patchwork of building departments. The same kitchen project permits differently depending on your address:

Where you liveWho reviews your permit
Fort Myers (city limits)City of Fort Myers
Cape CoralCity of Cape Coral, which runs its own building division
Bonita SpringsCity of Bonita Springs
SanibelCity of Sanibel, under the Sanibel Plan's additional standards
Fort Myers BeachTown of Fort Myers Beach, with flood zone review on most projects
Matlacha, Pine Island, Buckingham, Lehigh Acres, and other unincorporated areasLee County

The departments differ in review times, inspection scheduling, and how strictly they interpret edge cases. On the islands, flood zone rules add a second layer: projects on Fort Myers Beach and Sanibel are reviewed against FEMA substantial improvement rules, which we covered in a separate guide.

What the process looks like

For a typical remodel, your contractor prepares drawings, submits the application with contractor license and insurance information, and the jurisdiction reviews it. Larger projects record a notice of commencement before work starts. Once issued, the permit sets up a sequence of inspections, from rough plumbing and electrical through final. The job is not done when the last tile is set; it is done when the final inspection passes and the permit closes.

Review times swing with volume. Simple trade permits can be same-week, while a remodel with structural changes takes longer, and post-hurricane surges slow everything down. Build permitting time into your project schedule rather than treating it as an afterthought.

Homeowners can pull permits. Should you?

Florida allows owner-builder permits on your own homesteaded property. What the exemption really means is that you take on the contractor's role: you supervise trades, you carry the liability, and you answer for the work at inspection. For a fence or a shed, some homeowners are glad to. For a remodel involving structure, plumbing, and electrical, having the licensed contractor pull the permit means the responsibility, insurance, and inspection history sit where they belong.

Why unpermitted work costs more in the end

We regularly get called to fix unpermitted work, and it is always more expensive the second time. The risks stack up:

  • At resale: unpermitted additions and conversions surface in inspections and title work, and buyers either walk or demand retroactive permits at your expense
  • With insurance: carriers can deny claims tied to unpermitted work, which in a hurricane state is a serious gamble
  • With the county: after-the-fact permits typically cost more, and non-compliant work may need to be opened up or removed for inspection
  • With the next owner's contractor: us, opening a wall and finding wiring that no inspector ever saw

Our approach

We handle permitting on every project we build: drawings, application, inspections, and closeout, in every Lee County jurisdiction as well as Collier and Charlotte counties. Requirements shift, and the building department for your address is always the final word, but you should never have to become a permitting expert to remodel your kitchen.

Planning a project and wondering what it will trigger? Ask us before you start. It's a five-minute conversation that can save a very expensive redo.

Matthew Plate

Co-Owner / License Holder

Matthew Plate is co-owner of Lunara Build and the holder of the company's Florida certified general contractor license (CGC1540312). He has worked in Southwest Florida construction since 2005 and leads the company's cabinetry design and fabrication, drawing every custom piece before it is cut in the Fort Myers shop.

More articles

Material Costs Climbed Again This Summer: What It Means for a Southwest Florida Remodel Budget

A construction industry report released August 17 put input costs up 7.1 percent year over year, with metals, lumber, and labor leading. Here is how we translate a national index into a real budget for a Fort Myers area project, and why the cabinet tariff schedule makes 2027 timing worth thinking about now.

Read more

Lee County Flood Maps Change This Summer: What It Means If You Are Planning a Remodel

FEMA is finalizing revised flood maps for six panels in unincorporated Lee County around Mullock Creek, with an effective date expected this summer. Here is how a flood zone change affects your permit, your renovation budget, and your insurance.

Read more

Tell us about your project

Our offices

  • Fort Myers
    3430 Willard Street
    Fort Myers, Florida 33916
    (239) 771-5568
    Hours
    Monday - Friday:8:00 AM - 4:00 PM
    Saturday:Closed
    Sunday:Closed